What does connecting solar panels cost? Prices 2026

Connecting solar panels to your meter cabinet in Noord-Brabant usually costs between €150 and €600. This covers the electrical job done by a certified electrician: connecting the inverter, a separate circuit in the fuse box and the cabling. The panels and the inverter themselves are not included here. Below you can read the prices per situation, with real worked examples.

4,8· 312 reviews
Certified installer2-year guaranteeInsured

Quick answer

In short

Connecting solar panels to your fuse box costs on average €150 to €400 for the inverter and a separate circuit. With a long cable run or a large three-phase system it rises to €600 or more. This is the connection by a certified electrician, separate from the panels and the inverter themselves.

Price guide

Fixed price upfront
Connect inverter to meter cabinet€ 150 to € 350
Separate circuit for the panels€ 100 to € 200
Complete connection (inverter + circuit)€ 150 to € 400
Large three-phase system€ 400 to € 800
Check smart meter and exporton request
Call-out charge (Noord-Brabant)€ 39

Indicative prices incl. VAT. You will always receive a tailored quote.

Prices by situation

Prices at a glance

Price per connection task

What you pay depends on exactly what needs doing. Often connecting the inverter and adding a separate circuit are enough together. These are guide prices including fitting and connection to the NEN 1010 standard, excluding the panels and the inverter themselves.

TaskWhat we doPrice incl. fitting
Connect inverterConnect the inverter to the existing meter cabinet€ 150 to € 350
Add a separate circuitDedicated circuit with a breaker for the PV installation€ 100 to € 200
Complete connectionInverter plus separate circuit, connected and tested€ 150 to € 400
Cabling from roof to meter cabinetRun cable from the loft or roof to the meter cabinetfrom € 75
Connection to a three-phase inverterLarger system neatly distributed across three phases€ 400 to € 600

Guide prices incl. fitting. If the connection is part of the installation of your solar panels, the 0% VAT rate often applies; separate electrical work (such as upgrading the meter cabinet) falls under 21% VAT. The quote always states it clearly.

Extra work and common extras

Sometimes extra work comes up, for example with a large system, a long cable run or a full fuse box. These are the most common additional prices.

ItemGuide price
Upgrade meter cabinet to three-phasesee meter cabinet upgrade costs
Long or awkward cable run (per metre)€ 5 to € 12 per metre
Extra feed-through or hole through the facade€ 40 to € 100
Fuse box too full, extra circuit needed€ 100 to € 200
Replace and connect old inverter€ 150 to € 350 (excl. inverter)
Fit surge protection€ 120 to € 200

We always discuss extra work upfront. No surprises afterwards.

Price breakdown

What determines the price of connecting?

No two roofs and meter cabinets are the same. Together these points determine what connecting your solar panels costs. That way you understand where your price comes from.

  • Separate circuit or not

    A PV installation belongs on its own circuit with its own breaker. If there is room in the fuse box, that is a small job. If the box is full, extra work comes up.

  • Single-phase or three-phase

    A small set of panels is connected to single-phase. For a large system a three-phase inverter is sensible, and sometimes your meter cabinet needs upgrading first.

  • Length of the cabling

    The cable runs from the inverter in the loft or on the roof to the meter cabinet. The longer and more awkward that route (feed-throughs, drilling, chasing in), the more time and materials.

  • Type and location of the inverter

    Connecting a single string inverter is standard work. Micro-inverters or optimisers, or an inverter in an awkward spot, take more time to connect neatly.

  • Condition of the meter cabinet

    A modern fuse box with room and good earthing is quickly done. An old fuse board or poor earthing has to be put right first, otherwise it is not safe.

  • Separate work or done all at once

    If you have the panels and the connection done by the same team, that saves on the journey. Having just the connection done is also possible, for example after a job by a PV company.

Worked examples

Worked examples from practice

To give a feel for the price, here are three situations of the kind we often come across in Brabant. You always get your price upfront, fixed and tailored.

Terraced house, small single-phase system

A family had eight panels fitted by a PV company but wanted the connection done by a certified electrician. The inverter is in the loft, the meter cabinet is modern and still has room.

  • Connect inverter€ 180
  • Separate circuit in the fuse box€ 120
  • Call-out charge€ 39
Total€ 339

Cabling was already run to the meter cabinet, so no extra work. Job finished and tested in half a day.

Semi-detached house, large three-phase system

A home with sixteen panels and a three-phase inverter. The meter cabinet was still single-phase, so it had to be upgraded first. After that we connected the inverter neatly distributed across the three phases.

  • Connection to three-phase inverter€ 480
  • Separate circuit for the PV€ 150
  • Cabling from loft to meter cabinet€ 110
  • Call-out charge€ 39
Total€ 779

The upgrade to three-phase is on top here and requires grid operator Enexis. See our meter cabinet upgrade cost page for that price and the application.

Replacing and reconnecting an old inverter

At a home with panels from 2012 the inverter had failed. The customer bought a new inverter themselves. We removed the old one, mounted the new one and connected it safely.

  • Remove old inverterincluded
  • Connect new inverter€ 220
  • Call-out charge€ 39
Total€ 259

The customer bought the inverter separately. We handled only the replacement and connection. We checked the circuit and earthing at the same time.

Good to know

Good to know before you connect

Connecting solar panels seems simple, but it demands care. This all plays a part in the choice and the costs, so you know what you are getting into.

Fitting panels and connecting them are two things

Many people have the panels fitted by a PV company. That is the roof work: mounting the panels and hanging the inverter. The electrical connection is a separate job: safely connecting the inverter to your fuse box, creating a dedicated circuit and testing everything to the NEN 1010 standard.

Some PV companies do that connection themselves, others do not, or not as a certified electrician. If you want to be sure the connection is correct and safe, or you have individual panels or an inverter that needs connecting, you call in a certified electrician. That is exactly what this page is about.

Why a safe connection matters

An inverter feeds power back into your installation. If the connection is done sloppily or without the right protection, that is a risk: overheating, unreliable earthing or a circuit that is not properly protected. In the event of fire or damage, an insurer looks at whether the work was done by a certified professional and to standard.

A dedicated circuit with the right breaker and good earthing ensure your system exports safely and shuts off neatly when it should. We hand over the connection tested, with a measurement report, so you know for certain it is correct.

Net metering is being phased out: mind your meter reading

Up to and including 2026 you can still fully offset the power you export against what you draw. From 2027 the net metering scheme ends and you only receive a payment for exported power. It then pays off more to use your own generation.

That makes a good connection and using your power smartly (for example with a home battery or by running appliances during the day) more important. Feel free to ask us for advice on what is sensible in your situation.

VAT and the 0% rate on solar panels

For the supply and installation of solar panels on or at a home, a VAT rate of 0% has applied since 2023. That means you no longer pay VAT on the panels themselves and the associated fitting, and no longer have to reclaim the VAT from the tax authorities.

Please note: this 0% rate applies to the solar panel installation as a whole. Separate electrical work that stands apart from it, such as upgrading your meter cabinet to three-phase or other work in the fuse box, can fall under the normal 21% rate. What applies in your case depends on the situation. We always set it out clearly and correctly on the quote, so you know exactly where you stand.

Our quote states a fixed price: materials, labour, the call-out charge and the final test together. No after-the-fact billing. Only if something unexpected turns up during the work do we discuss it with you first.

Smart savings

Smart ways to save on the connection

Without compromising on safety, there are a few sensible ways to manage the costs.

Combine the work

Have the connection done at a moment an engineer is coming anyway, for example alongside an EV charger or upgrading your meter cabinet. One journey saves money.

Keep the cable run short

The shorter and easier the route from the inverter to the meter cabinet, the less work. When placing the inverter, think ahead about a logical spot.

Choose the right size straight away

Might you expand later, or are you adding a home battery or EV charger? Then choose a connection and fuse box that can handle it from the start. That avoids doing the work twice.

Why Brabant Elektra

Certified, insured and guaranteed

All our engineers are qualified and work to the NEN 1010 standard. We give a 2-year guarantee on all our work. Reliable work you can count on.

4,8· 312 reviews
Certified installer2-year guaranteeInsured
The Brabant Elektra team: eight qualified engineers in company clothing

Frequently asked questions

Questions about the price

The electrical connection costs on average €150 to €400: connecting the inverter and a separate circuit in the fuse box. With a long cable or a large three-phase system it rises to €600 or more. This is separate from the panels and the inverter themselves.
No. These prices cover the electrical connection: connecting the inverter, a separate circuit and the cabling. You buy the panels and the inverter themselves separately, usually from a PV company or supplier.
Yes, a PV installation belongs on its own circuit with its own breaker. That is safer and up to standard. If there is room in your fuse box, that is a small job. If the box is full, we add a circuit or advise a larger box.
Yes. If you already have the panels or buy an inverter yourself, we connect it safely to your meter cabinet, with a separate circuit and a final test. Connecting an inverter usually costs €150 to €350, excluding the inverter itself.
You leave the connection to the fuse box to a certified electrician. It is live work and must be done to the NEN 1010 standard. If you do it wrong yourself, it is dangerous and your insurer may refuse to pay out in the event of damage.
For a large system a three-phase inverter is sensible, so you distribute the generation neatly across the phases. If you still have a single-phase meter cabinet, it has to be upgraded first. That sometimes requires an application to grid operator Enexis, which we arrange with you.
For the solar panel installation on a home a VAT rate of 0% has applied since 2023. Separate electrical work that stands apart from it, such as upgrading your meter cabinet, can fall under 21%. We always set it out correctly on the quote, so it is right.
Yes. We give a 2-year guarantee on our work. We hand over the connection tested and to the NEN 1010 standard, with a measurement report. The supplier's warranty applies to the inverter and the panels.
Yes, that is what we are here for. We connect your solar panels as a certified electrician, whether you have just had the panels fitted or they have been on your roof for years. We create a separate circuit, connect the inverter safely to the NEN 1010 standard and hand over tested with a measurement report. You get a fixed price upfront and, across the whole of Noord-Brabant, a professional near you.

Service area

Connecting solar panels in Noord-Brabant

We connect solar panels across the whole of Noord-Brabant, from Eindhoven to Breda and from Den Bosch to Tilburg. The call-out charge within the region is a fixed amount, so you never face a travel-surcharge surprise.

Do you have a large system and does your meter cabinet need to go to three-phase? Then an application to grid operator Enexis is sometimes needed. We know the procedure and the waiting times in the region, and arrange that application with you. That way you know upfront where you stand.

Fixed price upfront

Have your solar panels connected safely at a fixed price?

Request a free quote or have a quick word with a certified electrician near you. You always get a fixed price upfront, no surprises afterwards.

4,8· 312 reviews
Certified installer2-year guaranteeInsured

Request a free quote

Response within 24 hours · no obligation

Step 1 of 3

How can we help you?