Brabant Elektra
Consumer unit & meter cabinet

Apply for a three-phase connection

Applying for a three-phase mains connection is done through your grid operator, and we help you manage the whole process correctly across Noord-Brabant.

4,8· 312 reviews
Certified installer2-year guaranteeInsured

About this job

What does applying for a three-phase connection mean?

The Netherlands has two types of low-voltage connection. A single-phase connection runs on 230 volts and delivers current via one phase. A three-phase connection uses three phases, with 400 volts between them. This allows more power to come in at once and distributes the load neatly across three channels. In practice, applying for a three-phase connection means upgrading your mains supply: from single-phase to three-phase, or from a lighter three-phase to a heavier one. This always goes through your grid operator.

The division of responsibility matters. The grid operator is responsible for everything up to and including the meter: the main fuse, the supply cable if needed and the meter. You submit your application through Mijnaansluiting.nl. Everything behind the meter, your meter cabinet and fuse box, is the work of a certified electrician. This page explains the application process. If you want your meter cabinet actually upgraded, see our Upgrade to three-phase service.

Warning signs

When do you need three-phase?

The energy transition is usually the trigger. If you recognise any of these situations, a three-phase connection is worth considering.

  • A heat pump

    Many fully electric heat pumps need a lot of power at once. Larger models in particular run more comfortably on three-phase, with start-up currents spread neatly across the phases.

  • An 11 kW EV charger

    Charging at 11 kW is only possible with three-phase. On single-phase, charging is limited to about 3.7 kW, which is much slower.

  • Heavy induction cooking

    A full induction hob peaks considerably. Alongside other high-demand appliances, single-phase can quickly become too limited.

  • Home battery or many solar panels

    With a three-phase inverter you spread the export across three phases, reducing the risk of the inverter tripping due to excessive grid voltage.

  • Heavy-duty power or a workshop

    An instantaneous water heater, sauna, swimming pool equipment or machinery and welding equipment in a workshop often require a three-phase connection.

  • The main fuse keeps tripping

    If the main fuse trips regularly under simultaneous use, or the electrician says there is no room for another circuit, your supply is too light.

How we work

How to apply for a three-phase connection

The application process follows a fixed sequence. Here is exactly what happens and who does what.

  1. 1

    Determine the connection rating

    Discuss with an electrician which connection rating you need and check what you have now in your meter cabinet. Do not go heavier than necessary: that keeps your fixed network costs down.

  2. 2

    Check network capacity

    Through Mijnaansluiting.nl and your grid operator's checker you can see whether capacity is available at your address and what the expected lead time is.

  3. 3

    Submit the application

    You submit your application through Mijnaansluiting.nl, the central portal for the grid operators. In Noord-Brabant this mostly goes to Enexis.

  4. 4

    Upgrade and meter cabinet preparation

    The grid operator upgrades the supply: the main fuse, the cable if needed and the meter. A certified electrician prepares your meter cabinet. The latter is our Upgrade to three-phase service.

Good to know

Good to know before you apply

Three questions that come up regularly around applying for three-phase. We explain them calmly.

Who does what: the grid operator, the electrician and you?

The grid operator is responsible for the connection up to and including the meter. They adjust the main fuse, replace the supply cable if needed and fit a new meter. You apply for this through Mijnaansluiting.nl. The grid operator has no say over your internal installation.

The certified electrician adjusts everything behind the meter: the fuse box, the circuits, the earthing and the cabling to, for example, your heat pump or EV charger. That is our Upgrade to three-phase service. Your own role is limited: discuss the right connection rating and submit the application. Digging or tampering with the main supply yourself is not allowed and is dangerous.

Do I already have a three-phase connection?

You can usually see this in your meter cabinet. With single-phase, there is one fuse or main switch with two wires, and it typically shows 1x25A or 1x35A. With three-phase, you see a wider main switch with four poles and a rating of 3x25A, 3x35A or higher. Not sure? An electrician can tell at a glance.

Your meter also gives a clue. A three-phase meter shows three phases, usually indicated as 3x230/400 V. If you are sure you already have three-phase but want a heavier supply, you apply for an upgrade within three-phase, for example from 3x25A to 3x35A.

3x25A or 3x35A: which connection rating should you choose?

For most homes with a heat pump or an 11 kW EV charger, 3x25A is more than sufficient. The advantage is that 3x25A falls in the same tariff category at the grid operator as single-phase. Your fixed network costs remain virtually the same. Switching from single-phase to 3x25A therefore barely increases your monthly costs.

Only when you need more simultaneous power, for example heavy usage or several large appliances at once, do you choose 3x35A or higher. Note: from 3x35A onwards, fixed network costs rise sharply. Do not go heavier than necessary, and have an electrician calculate your actual load.

Connection ratings and capacity

What your connection can handle depends on the connection rating: the number of phases multiplied by the current. For reference, the most common values with an indication of the available capacity.

Connection ratingCapacity (indicative)Often suitable for
1x35A (single-phase)± 8 kWOne extra heavy appliance within single-phase
3x25A (three-phase)± 17 kVAHeat pump or 11 kW EV charger, most homes
3x35A (three-phase)± 24 kVAHeavy usage, note higher fixed network costs
3x50A (three-phase)± 35 kVALarger home or several high-demand appliances
3x63A (three-phase)± 44 kVAVery heavy usage
3x80A (three-phase)± 55 kVAUpper limit of small consumers; above this is large-scale supply

Three-phase capacity is calculated as the square root of 3 times 400 V times the current. Up to 3x80A you are a small consumer with fixed tariffs. Always check the current values and rates with your grid operator.

Price

What does applying for a three-phase connection cost at the grid operator?

The costs consist of three parts: the one-off charge from the grid operator, the ongoing network costs and the electrician's work on your meter cabinet. The latter falls under our Upgrade to three-phase service. Below is an indication of costs at the grid operator. Amounts are indicative and dated (Liander 2026 and Enexis 2025, including 21% VAT). Always check current rates with your own grid operator.

Common extras:

  • Fixed capacity tariff up to 3x25A: ± € 476 per year (Enexis 2025), broadly the same as single-phase.
  • From 3x35A: ± € 2,028 to € 4,907 per year in fixed network costs (Enexis 2025).
  • Replacement of supply cable or meter cabinet: surcharge from the grid operator.
  • Electrician's work on the meter cabinet and fuse box: separate quote.

Price guide

Fixed price upfront
Upgrade from single-phase to three-phase (up to 3x80A), one-off± € 369
Upgrade within three-phase (3x25A to heavier), one-off± € 304
Entirely new three-phase connection (3x25A), one-off± € 1,662
Entirely new three-phase connection (3x63A or 3x80A), one-off± € 2,493
Meter cabinet preparation by certified electriciansee Upgrade to three-phase

Indicative prices incl. VAT. You will always receive a tailored quote.

Why Brabant Elektra

Certified, insured and guaranteed

All our engineers are qualified and work to the NEN 1010 standard. We give a 2-year guarantee on all our work. Reliable work you can count on.

4,8· 312 reviews
Certified installer2-year guaranteeInsured
The Brabant Elektra team: eight qualified engineers in company clothing

Frequently asked questions

Good to know

You apply for a three-phase mains connection through Mijnaansluiting.nl, the central portal for the grid operators. Your application goes automatically to the right grid operator, in Noord-Brabant usually Enexis. First discuss the right connection rating with an electrician and check network capacity at your address.
The grid operator upgrades the connection up to and including the meter: the main fuse, the cable and the meter. A certified electrician updates the meter cabinet and fuse box behind it, in accordance with NEN 1010. Digging or tampering with the main supply yourself is not allowed and is dangerous. For the work on your meter cabinet, see our Upgrade to three-phase service.
Yes. You apply to the grid operator to upgrade from single-phase to three-phase, and a certified electrician makes your meter cabinet and fuse box suitable. Both go together. This page explains the application; for the installation work, see our Upgrade to three-phase service.
At the grid operator, upgrading from single-phase to three-phase is indicatively around € 369 one-off if the existing cable is suitable (Liander 2026, including VAT). If the cable or meter cabinet needs replacing, the cost rises. A completely new three-phase connection is more expensive. The electrician's work comes on top of this. Amounts are indicative; check current rates with your grid operator.
For most homes with a heat pump or an 11 kW EV charger, 3x25A is enough. It falls in the same tariff category as single-phase, so your fixed network costs remain virtually the same. Only when you need more simultaneous power do you choose 3x35A or heavier, and then your fixed annual costs rise sharply. Do not go heavier than necessary.
It varies by address. Where the network has capacity, it takes a few weeks to a few months. Where the network is full, the waiting time can stretch considerably: in extreme cases according to Enexis up to ten years. You can see the expected time at your address when you apply. Apply in good time.
Since 1 July 2026, small consumers too, meaning connections up to 3x80A, can be placed on a waiting list where the network is full. Priority is based on social importance, not on the size of the application. In parts of Brabant, little capacity is expected in the short term. Apply in time and check capacity at your address.
With single-phase you see one main fuse or main switch, usually rated 1x25A or 1x35A. With three-phase the main switch is wider with four poles and shows 3x25A or higher. Your meter then shows three phases, often shown as 3x230/400 V. Not sure? An electrician can tell straight away.
No. Charging on single-phase is limited to about 3.7 kW. For 11 kW a three-phase connection is required. That is the reason many people apply for three-phase, often in combination with a heat pump or induction cooking.

Service area

Applying for three-phase in Noord-Brabant

Large parts of Noord-Brabant have a congested grid. From 1 July 2026, small consumers too, meaning connections up to 3x80A, are placed on a waiting list where the network is full. Priority is no longer based on the size of your application, but on social importance. In areas including Eindhoven, Helmond, Tilburg and Uden, little capacity is expected to become available in the short term. The grid operator for the greater part of Brabant is Enexis.

Our advice: apply in good time and check capacity at your address beforehand. Where the network has room, it goes relatively quickly, from a few weeks to a few months. Where the network is full, the waiting time can stretch considerably: in extreme cases according to Enexis up to ten years. Do not wait until your heat pump or EV charger is already installed.

Get help now

Ready to have this job done professionally?

Request a free quote or call an electrician near you directly. You will always get a fixed price upfront.

4,8· 312 reviews
Certified installer2-year guaranteeInsured

Request a free quote

Response within 24 hours · no obligation

Step 1 of 3

How can we help you?